MARC보기
LDR00000nam u2200205 4500
001000000432250
00520200224115456
008200131s2019 ||||||||||||||||| ||eng d
020 ▼a 9781088306727
035 ▼a (MiAaPQ)AAI13900214
040 ▼a MiAaPQ ▼c MiAaPQ ▼d 247004
0820 ▼a 350
1001 ▼a Shang, Luming.
24510 ▼a Achieving Public Agency Goals in Public-Private Partnerships Using Innovative Payment Mechanisms.
260 ▼a [S.l.]: ▼b University of Washington., ▼c 2019.
260 1 ▼a Ann Arbor: ▼b ProQuest Dissertations & Theses, ▼c 2019.
300 ▼a 179 p.
500 ▼a Source: Dissertations Abstracts International, Volume: 81-04, Section: A.
500 ▼a Advisor: Abdel Aziz, Ahmed.
5021 ▼a Thesis (Ph.D.)--University of Washington, 2019.
506 ▼a This item must not be sold to any third party vendors.
506 ▼a This item must not be added to any third party search indexes.
520 ▼a Public-Private Partnership (PPP), as an innovative project delivery method, is increasingly used due to its advantages in relieving the capital pressures on project development and involving more life-cycle considerations in project early planning stage. Under a PPP concession contract, the achievement of public agencies' goals can be facilitated through linking the contractor's compensation, referred to as payment mechanism, to the realization of stated project performance and achievement of government goals. Payment mechanism lies at the heart of PPP contracts. A good design of the payment mechanism should consider public agencies' goals in the project, allocate risks appropriately to stakeholders, and assure satisfactory performance through providing reasonable compensation to the private developer. While the procedures and recommendations for the design of payment mechanisms have been widely discussed in publications, guidance on how to link the achievement of project objectives with the concessionaire's payment is relatively scarce. As such, the concessionaire would be getting compensation without being subject to scrutiny over the achievement of project objectives. In this case, the public agency's goals (e.g. improve roadway safety and availability) may not be fully achieved through PPP. Additionally, the design of payment mechanisms in the existing PPP projects heavily relies on the subjective judgment of decision makers, which is hard to guarantee the trustability of the payment mechanism. To deal with the these deficiencies as well as to provide a systematic understanding of the design of payment mechanism, this study undertook an in depth literature review on the design of payment mechanisms, conducted a content analysis of several guidance documents regarding payment design from different countries, analyzed the payment-related contractual terms of more than 89 PPP projects and conducted questionnaire surveys to PPP experts from both academia and industry. Based on such works, a practical explanatory framework was developed to assist public owners in designing proper payment mechanisms for transport PPPs. The framework helps in (1) identifying the key considerations, (2) prioritizing project goals, and (3) deciding proper payment schemes and payment type(s). This study further proposed a Stackelberg game theory-based model to determine the optimal amount of payments assigned to each goal. The model searches for solutions that maximize the overall project performance for the sake of social welfare while simultaneously maximize the return for the sake of private investment. A case study based on a real PPP project was discussed to validate the effectiveness of the proposed model. Public agencies would use the framework as a reference to revisit and improve their design of payment mechanisms for their PPP project. Also, the solution provided by the model revealed that the optimal payment mechanism structure could be reached such that it would satisfy the owner's requirements for the overall project performance while optimizing the project total payments to the contractor.
590 ▼a School code: 0250.
650 4 ▼a Civil engineering.
650 4 ▼a Operations research.
650 4 ▼a Public administration.
690 ▼a 0543
690 ▼a 0796
690 ▼a 0617
71020 ▼a University of Washington. ▼b Built Environment.
7730 ▼t Dissertations Abstracts International ▼g 81-04A.
773 ▼t Dissertation Abstract International
790 ▼a 0250
791 ▼a Ph.D.
792 ▼a 2019
793 ▼a English
85640 ▼u http://www.riss.kr/pdu/ddodLink.do?id=T15492159 ▼n KERIS ▼z 이 자료의 원문은 한국교육학술정보원에서 제공합니다.
980 ▼a 202002 ▼f 2020
990 ▼a ***1008102
991 ▼a E-BOOK