대구한의대학교 향산도서관

상세정보

부가기능

Carbon Budget and Cost Analysis of C2CNT: A Carbon Dioxide to Solid Carbon Conversion Process

상세 프로파일

상세정보
자료유형학위논문
서명/저자사항Carbon Budget and Cost Analysis of C2CNT: A Carbon Dioxide to Solid Carbon Conversion Process.
개인저자Srinivasan, Pavitra.
단체저자명The George Washington University. Environmental & Occupational Health.
발행사항[S.l.]: The George Washington University., 2018.
발행사항Ann Arbor: ProQuest Dissertations & Theses, 2018.
형태사항98 p.
기본자료 저록Dissertation Abstracts International 80-01B(E).
Dissertation Abstract International
ISBN9780438322608
학위논문주기Thesis (Dr.P.H.)--The George Washington University, 2018.
일반주기 Source: Dissertation Abstracts International, Volume: 80-01(E), Section: B.
Adviser: Peter T. LaPuma.
요약The industrial sector accounts for approximately 30% of global CO2 emissions as of 2015 and lacks mature technologies to substantially reduce emissions. Many industrial processes, such as cement production, emit carbon dioxide (CO2) without a vi
요약Under the first research element the lifecycle carbon budget of a full scale model is assessed based on best available lab information. The research findings show electricity consumption is a key driver in the C2CNT carbon conversion process. By
요약The C2CNT process could substantially lower the price of carbon nanotubes making it a valuable substitute for construction materials. C2CNT Carbon would therefore result in avoided CO2 emissions from other construction materials such as steel, a
요약The carbon budget study demonstrates the C2CNT technology can substantially reduce greenhouse gas (GHG) emissions from industrial processes and could offer a revenue generating alternative compared to other Carbon Capture and Sequestration (CCS)
요약Under the second research element, an economic feasibility analysis is presented for C2CNT. The results estimate C2CNT operating costs are primarily driven by the 8.93 MWh of electricity/tonne of carbon, which at $80/MWh will cost {dollar
요약Assuming the capital costs of building a C2CNT facility is similar to an aluminum smelter ($3,500--$5,000/tonne of installed capacity), a C2CNT facility capable of processing 2 million tonnes of CO2/year (typical CO2 emissions from
요약This technology contrasts with other CDR technologies that often do not create a large revenue stream and create potential liabilities.
요약Lastly, a sensitivity analysis indicates that a carbon nanotube price in the region of $3,000 is very likely to yield a positive Net Present Value (NPV) for a C2CNT plant and even prices below this have a high likelihood of a positive NPV
일반주제명Public health.
Climate change.
Energy.
언어영어
바로가기URL : 이 자료의 원문은 한국교육학술정보원에서 제공합니다.

서평(리뷰)

  • 서평(리뷰)

태그

  • 태그

나의 태그

나의 태그 (0)

모든 이용자 태그

모든 이용자 태그 (0) 태그 목록형 보기 태그 구름형 보기
 
로그인폼